Manufacturing Facility

Warehouse Tour

5-Stage Quality Testing
Stage 1:
The motherboard, CPU, memory, and all the components are tested to check that all parts are compatible and functional before assembly.

Stage 2:
After system assembly, our engineers run the functional, configuration, and format tests.

Stage 3:
Our software runs the systems for 12 hours at temperatures between 95° F to 102° in our burn-in room.

Stage 4:
Engineers perform functional and input/output tests; results are documented in a final test report. Software loading is performed.

Stage 5:
A final Quality check where each system goes through a visual and specification adherence inspection.


STAGE 1   STAGE 2   STAGE 3   STAGE 4   STAGE 5
Pre-assembly test   System assembly   High temperature burn-in   Functional testing   Final Q.C. inspection

Copyright © 2007 AMAX Information Technologies. All rights reserved.
Prices, promotions, descriptions, specifications and other information are subject to change without notice. All products are subject to availability from the manufacturer.
Terms and Conditions of Sale. Privacy Policy